DoI reduces hours after lengthy queues at busy junction
Temporary traffic lights at Braddan Bridge will no longer operate at peak times following long queues this morning.
Three-way controls had been due to operate at all times while emergency repairs are made to a retaining wall at the roadside, which was damaged by recent poor weather.
However, the Department of Infrastructure says it will now only operate the lights between 9.30am and 3.30pm in a bid to reduce the impact.
The DoI is appealing for motorists to obey the lights to ensure maximum time can be given to each flow of traffic.
Patients 'strongly satisfied' with virtual GP pilot
New electrical vehicle training course powers up at UCM
Island to mark the golden anniversary of the Millennium of Tynwald
Onchan Commissioners open 'expressions of interest' for future social housing projects