MUA says it has reduced volume of sewage pumped into Peel bay
The Manx Utilities Authority says it has reduced the volume of sewage being pumped into Peel bay during the daytime.
The move comes after a leak was discovered in the outfall pipe, creating a potential health hazard for bathers.
A diving team will inspect the cracked pipeline on Monday and suggest how it can be repaired.
The MUA says the 'small' breach has not led to large amounts of sewage escaping in shallow water.
However, members of the public using the beach this weekend are urged to be cautious.
MUA chairman Alf Cannan says they await an expert assessment.

Report highlights risks of environmental crime entering financial system
Peel secondary school to carry out lockdown drill next week
KWC to offer A-Levels from September
Last chance to contribute to public consultation on changes to election regulations
Property transactions on Island dip in December