Repairs being carried out by Colas
Continuing problems on Richmond Hill in Douglas, are "incredibly disappointing".
That's from the Infrastructure Minister Ray Harmer.
A 30 mile per hour speed limit is currently in place, as further work is carried out on the road's surface.
Highway contractor Colas is repairing the defects on behalf of the DOI.
Mr Harmer says the timeline for repairs however is now up in the air:
Isle of Man inflation eases slightly to 2.8% in October
Progress on autism strategy welcomed
Paper car tax discs cost DOI £7,500 each month
Just over half the vehicles examined were defective