Engineers carrying out more checks
It’s hoped the Island’s incinerator will re-open this morning (Saturday).
A large tree stump about three feet in diameter yesterday blocked the energy from waste plant, forcing the plan to be shut down temporarily.
It was the third blockage at the site in less than a week.
Infrastructure engineers are now carrying out more regular spot-checks to detect oversized items of waste.

Onchan election result stands but Edge loses votes
'Not realistic' to say road fuel increases create a specific windfall in VAT
One person treated for smoke inhalation following Anagh Coar flat fire
Community information sessions planned for offshore wind farm proposal
Comments
Add a comment