Leisure pool shut since 2018
An MHK wants to know what progress has been made on the NSC flumes during the coronavirus lockdown.
The pool at the sports centre has remained closed, but the construction sector was able to return to work at the end of April.
The leisure pool and slides have been shut since the pool closed for refurbishment in August 2018, with manufacturing issues causing delays.
Arbory, Castletown and Malew MHK Jason Moorhouse hopes the facility is now a step closer to reopening:
Procedures at Noble's Hospital cancelled due to 'significant pressures'
Medical Society calls for 'statutory elected body' as chief exec exits Manx Care
Cope out: How did we get here?
Teresa Cope: Reaction as Manx Care CEO steps down
Manx Care CEO to step down