Traffic still restricted as DoI awaits design
The re-opening of the Ramsey Swing Bridge to vehicular traffic would appear to still be some way off.
The Victorian bridge has been closed to traffic since January, though pedestrians can still cross.
The Department of Infrastructure imposed the partial closure following a survey which revealed areas of concern with parts of the deck structure.
In its latest update the department says it's still awaiting a design before repair work can go ahead.
As a result there's no fixed timescale for the re-opening of the bridge.
Creamery working to solve the mystery of tight screw caps on cartons
Young people's bereavement drop in service coming to an end
Pub's inclusive toilet signs vandalised
£100K cash injection for energy efficiency scheme
Regulator investigates potential Manx Radio licence compliance issue