Resurfacing begins tonight
Re-surfacing work on a busy stretch of road in the capital begins this evening (Monday).
A section between Quarterbridge and the roundabout at Braddan Bridge will be closed between 6.30pm thirty and 5am each day until September 26.
The work is designed to improve the state of the road and deal with problems caused by standing water.
Parking will be suspended on the alternative route via Saddle Road.

Creamery managing director to leave role
Fast-tracked legislation was designed to close 'loophole of expanding problem'
Farmers 'feeling the squeeze' more than ever says MNFU
Too soon to say if Finnish TT rider will have permanent vision problems
MLC given leave to introduce bill to tackle gazumping and gazundering