Recent closure of NSC a reminder why new bridge required
The recent heavy rain, which saw the National Sports Centre close because of rising river levels, is one of the main reasons for Pulrose Bridge being replaced.
That's according to Infrastructure Minister Tim Baker.
The facility shut its doors and put flood prevention measures in place on Thursday 4 February.
Mr Baker says the current bridge is no longer fit for purpose:-
Introducing ID checks on boats could help strengthen Island's borders
Government prepared for ‘targeted response’ if Middle East conflict stretches on
Mannin Music confirms Peel beach stage trial go ahead for summer
First cruise ship of the season to arrive today
UK wool being used on peat restoration scheme