It's after oversized vehicle pulled down part of the line
It could cost up to £5,000 to fix downed tram lines between Onchan and Baldrine.
Extensive damage was caused on Wednesday when an oversized vehicle attempted to drive under the wires.
On top of that, 200m of the copper wiring needed to repair the damage was stolen.
It's understood there have been multiple arrests in connection with the incident.
Andy Cowie is the chief engineer at the Transport Services:

Three-month wait for state pension forecast statements
No timeline yet for reinstatement of rehab service to north
Manx Care TT ready despite 'exceptional' pressures faced last week
Manx Telecom merger not scrutinised by Manx Government
'Isle of Man could drive drug reform innovation'