Structure will be one-way for the fortnight
Laxey residents and visitors are set to have a route through the lower part of the village during the TT.
A replacement bridge is being opened temporarily for the period.
The previous structure collapsed during the floods in early December last year, with a bus falling into the river with it.
During the fortnight, a single lane will operate on a two-way basis, with vehicles heading north from Old Laxey Hill being given priority.
Pedestrians must still use the temporary footbridge currently in place.
Straight after the TT, the bridge will be shut for a time again to finish off the work.
It's is due to be completed by September.
Child benefit payments delayed due to technical issue
Manx Care says it is 'doing a lot of work' to tackle concerns raised by doctors
New elective surgical unit will be 'nice controlled environment'
Manx dancer, teacher and festival organiser 'in awe' at RBV win
MNFU calls for ability to trade with UK to be made a priority